{"id":6546,"date":"2025-12-17T09:47:35","date_gmt":"2025-12-17T08:47:35","guid":{"rendered":"https:\/\/www.eurotrol.it\/?p=6546"},"modified":"2025-12-17T09:47:35","modified_gmt":"2025-12-17T08:47:35","slug":"the-drinking-water-project-for-the-amakpape-hospital-in-togo-continues","status":"publish","type":"post","link":"https:\/\/www.eurotrol.it\/en\/the-drinking-water-project-for-the-amakpape-hospital-in-togo-continues\/","title":{"rendered":"THE DRINKING WATER PROJECT FOR THE AMAKPAP\u00c9 HOSPITAL IN TOGO CONTINUES!"},"content":{"rendered":"<p>The project is proceeding as planned: we have worked with LUCONLUS\u2019 volunteers to study the best system to ensure proper water treatment.<\/p>\n<p>&nbsp;<\/p>\n<p>After examining the local water analysis, we made the sizing and defined the processes that will be the basis to organise a system tailored to the needs of the hospital for the local population. We collected all the necessary components to donate and planned the shipment.<\/p>\n<p>&nbsp;<\/p>\n<p>It was a real team effort that involved us and LUCONLUS\u2019 volunteers: it is exciting to see how so many people dedicate their time and professional skills to give substance to the values they believe in, helping others.<\/p>\n<p>&nbsp;<\/p>\n<p>We at Eurotrol also want to contribute to this project by providing a piece of this great puzzle that can only be completed thanks to the collaboration and commitment of many.<\/p>\n<p>&nbsp;<\/p>\n<p>Don&#8217;t miss the next updates!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The project is proceeding as planned: we have worked with LUCONLUS\u2019 volunteers to study the best system to ensure proper water treatment. &nbsp; After examining the local water analysis, we made the sizing and defined the processes that will be the basis to organise a system tailored to the needs of the hospital for the [&hellip;]<\/p>\n","protected":false},"author":13,"featured_media":6573,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24],"tags":[],"class_list":["post-6546","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"_links":{"self":[{"href":"https:\/\/www.eurotrol.it\/en\/wp-json\/wp\/v2\/posts\/6546","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eurotrol.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eurotrol.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eurotrol.it\/en\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eurotrol.it\/en\/wp-json\/wp\/v2\/comments?post=6546"}],"version-history":[{"count":5,"href":"https:\/\/www.eurotrol.it\/en\/wp-json\/wp\/v2\/posts\/6546\/revisions"}],"predecessor-version":[{"id":6570,"href":"https:\/\/www.eurotrol.it\/en\/wp-json\/wp\/v2\/posts\/6546\/revisions\/6570"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eurotrol.it\/en\/wp-json\/wp\/v2\/media\/6573"}],"wp:attachment":[{"href":"https:\/\/www.eurotrol.it\/en\/wp-json\/wp\/v2\/media?parent=6546"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eurotrol.it\/en\/wp-json\/wp\/v2\/categories?post=6546"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eurotrol.it\/en\/wp-json\/wp\/v2\/tags?post=6546"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}